Computer vision solutions for manufacturing

Custom computer vision for manufacturing

Automate visual quality control, detect defects, verify assemblies and monitor production with computer vision systems built around your manufacturing processes.

From feasibility assessment to production deployment, Agmis develops and integrates AI solutions that work with your existing equipment and production lines.

Real-time
Defect detection at hardwood flooring production speed
Founded 2007 ISO/IEC 27001 Certified AI Innovation of the Year 2025 EU-based
Applications

Computer vision applications in manufacturing

From surface inspection to assembly verification and production monitoring, we develop computer vision and machine vision systems that support quality control, throughput and traceability on existing manufacturing lines.

01

Surface and cosmetic defects

Catch scratches, dents, color deviation and coating faults before parts ship, so defective products are held for targeted rework rather than reaching the customer.

02

Assembly verification

Confirm the right component is present, oriented and seated before the part moves downstream, preventing rework that would otherwise surface at final assembly.

03

Presence and count checks

Automate repetitive counting and kit completeness checks, and reduce discrepancies that currently take hours to trace after dispatch.

04

Safety and PPE monitoring

Identify missing protective equipment and zone intrusion earlier, and route alerts to the supervisor responsible for that area. Monitoring supports your safety process and does not replace the safeguards the line already requires.

05

Inline quality records

Attach each inspection result and its image to the part, so a complaint six months later can be investigated with evidence instead of recollection.

Engineering

Engineering computer vision for real production environments

Reliable visual inspection depends on more than model accuracy. We assess the defect definition, image capture conditions, production speed and integration requirements before developing a system.

  1. Defect definition

    A scratch is not a defect class. A scratch longer than two millimeters on a matte surface, visible at the specified inspection distance, is a defect class. We agree measurable criteria with your quality team, because two inspectors who disagree on the same part give the model an inconsistent target.

  2. Image capture and line speed

    Camera, lens, lighting, working distance, resolution and the time available per part are specified against real parts under production lighting. If the defect cannot be imaged consistently, model quality cannot compensate for it at line speed.

  3. Production integration

    Every decision has to reach the right place: an operator screen, a reject mechanism, a PLC signal or your MES. We define that path with your engineers and agree who supplies and installs the hardware.

  4. Long-term maintenance

    Products, suppliers and coatings change. We plan for performance monitoring, model retraining and clear ownership from the start, helping maintain inspection reliability as your production conditions evolve.

Process

From feasibility to production deployment

01

Understand the inspection challenge

Share the part, the defect or the monitoring objective, the current process and any sample images or video you have.

02

Assess feasibility

We evaluate visual detectability, production constraints and data quality, propose a technical approach and state what further testing is needed.

03

Pilot on a production line

We validate the agreed acceptance criteria, latency, integration and real-world variation within a controlled scope before scaling.

04

Deploy and hand over

We integrate the agreed system, document operation and define monitoring, maintenance and retraining responsibilities.

For an initial assessment, 50 to 100 representative images or short clips of good and bad parts are usually enough to say whether the defect is worth pursuing. That is a starting sample, not a training dataset. A useful pilot also needs someone on the plant side who can settle a disagreement about what counts as a defect, and production time long enough to see normal variation.

Questions plants ask before the first call

Do we need to replace our existing cameras?

Not necessarily. Suitability depends on resolution, optics, lighting and the inspection criteria. Cameras bought for monitoring are often not adequate for measurement, but some are once lighting is controlled. We assess what you have before proposing hardware, and we tell you when the existing setup is the limiting factor.

How many images do we need to start?

For a preliminary feasibility view, 50 to 100 representative frames showing good parts and the range of defects are usually enough. Training and validation need more, and the amount depends on how much variation the line produces. Sample quality matters more than sample count.

Can it run on the hardware we already have?

That depends on resolution and cycle time. A single defect class at moderate line speed often runs on an edge device beside the line. High resolution at short cycle times can need a GPU, and that purchase should follow the pilot rather than precede it.

What happens when the product changes?

Retraining may be required, depending on how far the change moves the images the model sees. A new coating, supplier or component shape can shift appearance enough to affect performance. Handover includes the retraining procedure and a named owner.

Should we build in-house, use our machine builder, or hire a specialist?

It depends on where the gap is. A new line usually arrives with vision in the specification, and the machine builder is the right supplier. An existing line with a hardware problem needs an integrator. An existing line where nobody has defined the defect precisely enough to automate is a software problem. In-house works when you already have machine learning engineers with spare capacity. Ask any supplier, including us, where their last deployment of this type failed, and why.

What if the defect is not visually detectable?

Then vision is not the right instrument, and we say so at the feasibility stage. Some defects need ultrasound, load testing or chemical analysis rather than a camera.

How long does a project take?

Feasibility is usually a short piece of work. A pilot runs as long as it takes to see the variation the line actually produces, which depends on your production schedule and how often the product changes. We give a project specific estimate after the feasibility step rather than a generic number up front.

What drives the cost?

The number of defect classes, the number of inspection stations, the complexity of integration with your line, the hardware specification and the level of ongoing support. Scoping one line and one defect class first keeps the initial commitment small and shows where the rest of the cost sits.

Will it slow down or stop the line?

Inline inspection is specified within the cycle time the line already runs, so it should not add a step. Installation and commissioning need access to the line, usually during planned downtime. The pilot is scoped so the production impact is limited and measurable.

How do we agree the system works?

Before the pilot, we agree acceptance criteria in writing: which defect classes are in scope, the accuracy expected for each, the tolerated false reject rate and the latency. The pilot is judged against those criteria rather than against a demo. Our guide to evaluating AI quality control systems covers the metrics in more detail.

What happens after deployment?

Handover covers documentation, operation and the retraining procedure. Ongoing monitoring and support are agreed as a separate arrangement, with a named owner on your side.

Next step

Tell us about your manufacturing challenge

Tell us what you want to inspect, verify or monitor. Our team will review your requirements and discuss the most suitable next steps.